Factory Direct Sale Automatic High Speed Mineral Water Filling Machine Price

Manufacturing facility Immediate Sale Computerized High Velocity Mineral H2o Filling Machine Value

 

Bottle Washing Part

CZPT cramps are employed in the bottle washing method. The vacant bottles can be turned in excess of 180° Together the conveying rail. There are two instances of interior and external washing, the efficiency of bottle washing is substantial.

Rinsing equipment adopts overturn and double-opened bottle clip. Bottle clip lock the bottleneck, the content of bottle clip is SUS304, which is hygienic and durable.

Bottle clip equipped with productive spray on nozzle. The extrusive droplet with 15° Angle assures to clean all aspect of the bottle, and can conserve the water.

Created of stainless steel of excellent high quality.
Geared up with bottle jam protection unit.

Bottle Filling Element

The design and style of filling composition is sensible and hygiene lifeless angle, the run of equipment is secure, it can management the content from the bottleneck, the management accuracy is within ± 2mm (topic to bottle design and style). The filling valve materials is SUS304. The filling program has liquid level computerized management. Filling valve elevate is managed by the valve elevator, right after filling valve contact the bottleneck, it start to fill. Bottle is conveying by the wheel in the filling part.

Bottle Capping Component


 

Screw capping equipment is most precision part in the 3-1 machine, it has a large affect to the items balance and faulty charge. 

 

  Applicable goods: Pure h2o, mineral water ,and so forth. (300ml-2000ml)

           Applicable  containers: PET bottles, glass bottles, metallic cans, pull ring cans and PP bottles.

           Filling basic principle : Gravity filling, flowmeter filling, weighing filling 

           Filling temperature : Room temperature

           Production ability : 3000BPH - 36000BPH 

Description:

This product is a kind of 3-in-1 unit water filling equipment for producing potable consuming drinking water like pure water, mineral water and many others.The gadget incorporates rinsing, filling and capping into one particular and is a type of full-automatic products. It is appropriate for producing PET and plastic bottled mineral water and purified drinking water. The approach of filling adopts gravity or micro-strain filling which can make the filling velocity quicker and far more stable. Consequently, in contrast with comparable items, this device has functions of larger output and greater benefits. The equipment is equipped with superior Mitsubishi programmable PLC to control the procedure and cooperated by frequency converter of the major motor it helps make the operation much more steady and reputable. The photoelectric sensor is utilized to detect running problems of every single section, which can make the operation of this tools very automatic and handy.

CZPT Attributes:

1. Immediate connection technology is adopted in between air conveyor and bottle-feeding star wheel, and there is no bottle feeding screw and conveying chain. It is very straightforward to adjust the bottle condition.

two. Bottleneck-hold technologies is adopted for bottle conveying. While modifying the bottle shape, end users only want to substitute the arc manual plate, star wheel and other nylon components that are relevant to the bottle diameter.

3. The three in 1 device machine incorporates rinsing, filling, and capping into 1, thus making bottle use price reduced, conveying exact and secure, altering bottle shape far more handy.

4. The specifically developed bottle gripper of rinser is manufactured of fully stainless steel,so it is sturdy and agency. In addition to, it isn't going to make contact with with the screw areas of bottleneck, as a result staying away from the secondary contamination.

five. The equipment is designed with high-velocity mass stream isobar filling valve to guarantee the high filling pace and exact liquid degree CZPT any loss. 

6.Elements getting in touch with with liquid are all produced of large-good quality stainless metal and foods-quality engineering plastic, and most electrical systems undertake imported elements that meet up with our state food hygienic standards.

seven. Bottle-outputting star wheel and bottle-bottom supporting plate adopt spiral winding strategy, and there is no want to change the peak of bottle conveying chain while shifting the bottle shape.

Main Versions:

Product

Output

XGF14-twelve-5

5000BPH (500ml)

XGF16-sixteen-5

7000BPH (500ml)

XGF24-24-6

10000BPH (500ml)

XGF32-32-8

15000BPH (500ml)

XGF40-40-10

18000BPH (500ml)

XGF50-fifty-twelve

22000BPH (500ml)

XGF72-72-eighteen

30000BPH (500ml)

XGF84-eighty four-twenty

36000BPH (500ml)

Primary goods

one. Mineral Drinking water/ Pure Water Filling Production Line
2. Carbonated Drink Filling Generation Line
three. Juice(with pulp)/ Tea Drink Filling Generation Line
4. Drinking water remedy, Bottle Unscrambler,Sterlizer and all kinds of auxiliary tools.
Occupation in dealing with all sort of beverage line turnkey venture!
5. Semi-auotomatic/ Entire-automatic PET Bottle Blowing Device
six. three-5 Gallon Barrel H2o Filling Generation Line 

Organization details

 Pre-sales  Q&A 

1.Are you a trading organization or a manufacturer?
We are a manufacturer with much more than fifteen many years experience offer the manufacturing facility price tag equipment with great good quality, welcome to pay a visit to !

two.Do you have reference task?
We have reference undertaking in most countries,If we get the authorization of the client who has introduced the equipment from us ,we can explain to you their get in touch with imformation,you can go to vist their manufacturing unit.
And you are always welcome to arrive to check out our organization,and see the equipment managing in our factory,we can decide you up from the station around our metropolis.
Contact our income individuals you can get movie of our reference working device

three.Do you have agent and after-provider stations?
So far we have agent in Yemen,Nigeria,Dubai,India,Kenya,Dubai welcome to be part of us!

4.Do you have any certification
we have been certificated by the well-known cercification authority http:///Certificates.html

5.Do you give turnkey project

Turnkey task CZPT We can support you to commence a new company in beverage generating.Pls make contact with with our revenue people

6.Do you give CZPT support
we can design and style the machines in accordance your specifications(materil ,electricity,filling kind,the varieties of the bottles,and so on),at the very same time we will give you our professional suggestion,as you know,we have been in this business for many a long time.

7.What is actually your guarantee or the guarantee of the high quality if we purchase your devices?
We offer you substantial good quality devices with 1 year guarantee and supply lifestyle-extended technical support.

Sale Q&A
one.What's your payment phrase?
We settle for thirty% deposit 70%TT ahead of shipment by TT/LC/Western union 

two.What's your shipping and delivery time period?
We provide EXW,FOB,CFR,CIF supply conditions

3.How to take a look at equipment just before shipping?
Equipment testing running more than 8 hours, and sending screening videos.

4.How about the Packaging particulars?
CZPT export packing, major products utilizing export plywood scenario packing, small merchandise use thick carton packing, guarantee that the merchandise packaging integrity and basic safety

Following sales Q&A
one.When can I get my machine following I paid?
Generally production time is about thirty-60days,the just depend on what sort of equipment you buy.The shipping and delivery time is based mostly on your vacation spot port.

2.How to put in my equipment when it arrives?how considerably the expense?
We will send our engineers to your manufacturing facility to put in the devices and practice your staff how to function the devices. CZPTer shell out round airtickets,engineer visa expense,lodging and engineer income USD100/day/individual.

3.When can i get engineers from you?
When you end the Planning conditions(drinking water source,electric power,air supply,manufacturing resources)get in touch with with our revenue folks we will dispatch engineer to put in the machine for you ,and practice your staff to use the device well.Generally when you preparing is done,you make contact with with our revenue men and women and cooperate us to get the visa for the engineer and our engineer will be here inside 15 times.

4.How prolonged time for set up?
In accordance your devices buy,we will send out one or two engineers to your plant,it will consider about ten times to 25 times.

5.How about the spare parts?
We will send one particular calendar year ample straightforward damaged spare elements collectively with the machines,transport collectively.During the guarantee time,we will source the spare elements with our cost which includes the supply expenses.

for even more more wants and inquiry pls contact with Skip
 

Speak to us

 

Factory Direct Sale Automatic High Speed Mineral Water Filling Machine Price